Date Completed: 2012

Size: 78 Units

Scope of work:  The SPC Team did major replenishing in this project. We replaced a significant amount of wood and structural beans throughout the complex. Several sides of the building were in major need of a stucco renovation.  Stucco, is a building material that is very durable, attractive, and a weather-resistant wall covering. After the constructing was completed, the team repainted all exterior walls with Premium Sherwin Williams paint.